Scope of Work: –
Supply, Installation, Testing & Commissioning the following: –
- Redesign the HVAC Drawings & Re-calculation the Cooling Loads, Pumps Head, Fans Static Pressure.
- Chilled water piping System completed with Valves, Insulation, Cladding, Rollers & Pipes Supports
- Air Ducting System completed with Dampers, Air Outlets, VAV’s, Insulation & Cladding.
- Chilled water equipment (Chillers, Air Handling Units, Fan Coil Units, Fans, Variable Air Volume).