KING FAISAL UNIVESITY (B#2,3,4,5,13,27,29,30,32&36)

About This Project

KING FAISAL UNIVESITY
(B#2,3,4,5,13,27,29,30,32&36)

Scope of Work: –

Supply, Installation, Testing & Commissioning the following: –

  1. Redesign the HVAC Drawings & Re-calculation the cooling Loads, Pumps Head, Fans Static pressure.
  2. Chilled water piping System completed with Valves, Insulation, Cladding, Rollers & Pipes Supports.
  3. Air Ducting System completed with Dampers, Air outlets, VAV’s, insulation & cladding.
  4. Chilled water equipment (Chillers, Air Handling Units, Fan Coil Units, Fans, Variable Air Volume).
Consultant

Main Contractor

Clients

Services

Start Date

Completion Date

Category
HVAC WORKS