Scope of Work: –
Supply, Installation, Testing & Commissioning the following: –
- Redesign the HVAC Drawings & Re-calculation the cooling Loads, Pumps Head, Fans Static pressure.
- Chilled water piping System completed with Valves, Insulation, Cladding, Rollers & Pipes Supports.
- Air Ducting System completed with Dampers, Air outlets, VAV’s, insulation & cladding.
- Chilled water equipment (Chillers, Air Handling Units, Fan Coil Units, Fans, Variable Air Volume).